Indonesia · province
Jawa Barat
DataCentersExposed tracks 3 AI data centers in Jawa Barat, Indonesia — 0 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 3 tracked operators.
Sources: Indonesia, Methodology
Tracked
3
Operating
0
In pipeline
0
Reported power
0 MW
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Facilities
Tracked data centers
- Area31PT. Dunia Virtual OnlineMapped (unverified)
- GTN Data CenterGraha Teknologi NusantaraMapped (unverified)
- Nodeast Cloud (srv01.kehidupan)PT Era Daya CiptaMapped (unverified)
In the local press
Jawa Barat data-center coverage
- Ekspansi Jakarta Campus Data Center, STT GDC Perkuat Fondasi Digital Indonesia dengan 4 Fasilitas dan Kapasitas AI Hingga 360 MWMobitekno· Jun 11, 2026
- RI Miliki Magnet Investasi Pusat Data, Lokasi Favorit Jabar-BatamBloomberg Technoz· Jun 10, 2026
- STT GDC Genjot Investasi Data Center di RI, Utamakan SDM Lokal dan Ekonomi DaerahInfobanknews· Jun 10, 2026
- PLN pasok listrik pusat data 2x725 MVA untuk Digital EdgeANTARA News· Jun 9, 2026
- Digital Edge dan PLN Amankan Pasokan Listrik 1,45 GW untuk Kampus Data Center AI Terbesar di BekasiHeadline.co.id· Jun 9, 2026
- PLN Suplai Listrik 2x725 MVA untuk Data Center Terbesar di Tanah AirTribunnews.com· Jun 9, 2026
Live headlines via Google News — in English and Indonesia's local press.