Skip to content
DataCentersExposed
Mapped (unverified)hyperscale

Apple data center, Crook County, OR

Crook County, OR

Source: OpenStreetMap

Apple data center in Crook County, OR is a mapped facility, operated by Apple Inc.. DataCentersExposed has documented a 9,228 sq ft footprint at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Apple Inc.
Operator
Apple Inc.
Footprint
9,228 sq ft
Utility
Bonneville Power Administration
Grid
BPAT
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Apple is a hyperscale data center in Crook County, Oregon, operated by Apple Inc., which sits at the top of the ownership chain. Records put its footprint at 9,228 square feet. The site draws power from the Bonneville Power Administration inside the BPAT balancing authority.

Operator chain

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Oregon reported $26.9M in Enterprise Zone (Long-Term Rural EZ, ORS 285C.400) property-tax abatement — Crook County (Meta Prineville campus) for FY2025 (Crook County, Oregon (audited financial statements / GASB 77 note)). Program-wide, not attributable to this site.

source · All Oregon subsidies →

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
8
PM2.5
Good

Air Quality Index from the nearest AirNow reporting area (Prineville), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$113.4K
People of color
6%
Below poverty
14%
Tract population
3,904

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Cascade Virtual Academy in Prineville, is 1.4 mi from this site (731 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.