3S Data Center Warsaw is a mapped data center in województwo mazowieckie, Poland. It runs on Poland's grid, which was 69% fossil-fuelled at 591 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
591 gCO₂/kWh
Clean electricity
31%
DC power price
21.48¢/kWh
Region
województwo mazowieckie
Overview
source: link3S S.A. — colocation facility (6 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
591 gCO₂/kWh
Clean electricity
31%
Fossil electricity
69%
Data-center power price
21.48¢/kWh
A large data center in Poland pays 21.48¢/kWh for electricity — a household pays 24.77¢, 13% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Poland data centers.
In the news
source: Google News (local + English)- Czy Polska ma szansę zostać centrum baz danych i czy to naprawdę szansa?edgp.gazetaprawna.pl· Apr 23, 2026
- Ogromne centrum danych powstaje pod Warszawą. To część inwestycji za 600 milionów euroWarszawa Nasze Miasto· Apr 14, 2026
- Data4 przyspiesza inwestycje w Polsce – drugie data center pod Warszawą już działaITwiz· Apr 9, 2026
- Data4 uruchamia drugie centrum danych pod WarszawąCRN Polska· Apr 9, 2026
- "Centra danych to fabryki XXI wieku". Otwarcie nowego obiektu pod WarszawąWarszawa.Wyborcza.pl· Apr 9, 2026
- Nowe centrum danych pod Warszawą. 600 mln euro i 400 miejsc pracyUrbanity· Apr 9, 2026