Atman Data Center Warsaw-1
województwo mazowieckie, Poland
Source: OpenStreetMap
Atman Data Center Warsaw-1 is a mapped data center in województwo mazowieckie, Poland. DataCentersExposed has documented a 288,944 sq ft footprint at this site. It runs on Poland's grid, which was 69% fossil-fuelled at 591 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~55-120 MW
Footprint
288,944 sq ft
Grid carbon
591 gCO₂/kWh
Clean electricity
31%
DC power price
21.48¢/kWh
Region
województwo mazowieckie
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
591 gCO₂/kWh
Clean electricity
31%
Fossil electricity
69%
Data-center power price
21.48¢/kWh
A large data center in Poland pays 21.48¢/kWh for electricity — a household pays 24.77¢, 13% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Poland data centers.
In the news
source: Google News (local + English)- Nowe centrum danych Atman zużyje tyle prądu co Huta WarszawaOKO.press· Sep 26, 2025
- Firma Atman otworzyła centrum danych pod Warszawąwnp.pl· Sep 18, 2025
- Pod Warszawą powstaje gigantyczne centrum danych Atman Data Center Warsaw-3Investmap· Dec 20, 2023
- Atman Data Center Warsaw-3 (WAW-3)Investmap· Oct 16, 2023
- Ruszyła budowa wielkiego centrum danych Atman Data Center Warsaw-3Investmap· Oct 16, 2023
- Atman rozbudowuje centrum danych w WarszawieITwiz· Sep 2, 2022