Skip to content
DataCentersExposed
County data-center profile

Henrico County, Virginia

DataCentersExposed tracks 20 AI data centers in Henrico County, Virginia — 3 operating and 0 in the pipeline, led by Meta Platforms, Inc.. Its transparent data-center risk score is 0/100.

Sources: Methodology, Coverage scorecard

Henrico County, Virginia has 20 tracked data centers, 3 of them operating. Its composite data-center risk score is 19 out of 100 — see the breakdown above for which factors drive it.

Facilities
20
Operating
3
Pipeline
0

Reporting by · Updated May 29, 2026

Risk breakdown
19Low
  • Project exposure · 33
  • Power demand · 0
  • Water draw · n/a
  • Land footprint · n/a
Overview

What's happening in Henrico County

Meta Platforms, Inc. has the largest presence in Henrico County. We resolve project codenames and shell LLCs back to the corporate parent wherever the public record allows, so the table below names who is actually behind each site.

Below: every tracked facility in the county, the active state legislation that names it or its county, and local news. Commissioner vote records arrive in a later release; the placeholders show where that accountability data will land.

20 facilities

Every tracked facility

FacilityOperatorStatusMW
Bank of AmericaOperating
Dc4
Sandston
Mapped (unverified)
Dc5
Sandston
Mapped (unverified)
Dc6
Sandston
Mapped (unverified)
Flexential - Richmond
Richmond
Flexential Corp.Operating
Meta Henrico Data CenterMeta Platforms, Inc.Mapped (unverified)
Meta Henrico Data CenterMeta Platforms, Inc.Mapped (unverified)
Ric1 Dc1Mapped (unverified)
Ric1 Dc2Mapped (unverified)
Ric1 Dc3Operating
Ric2 Dc1
Sandston
Mapped (unverified)
Ric2 Dc2
Sandston
Mapped (unverified)
Ric2 Dc3
Sandston
Mapped (unverified)
Ric2 Dc5
Sandston
Mapped (unverified)
Ric2 Dc6
Sandston
Mapped (unverified)
Ric3 Dc1
Sandston
Mapped (unverified)
Ric3 Dc2
Sandston
Mapped (unverified)
Ric3 Dc3
Sandston
Mapped (unverified)
Ric3 Dc4
Sandston
Mapped (unverified)
Ric3 Dc5
Sandston
Mapped (unverified)
Accountability

County commissioners

How the Henrico County board votes on each data-center matter — the rezonings, the abatements, the water permits — is built from public-meeting minutes and roll-call records. Know of a vote we should be tracking? Tell us.

Methodology & sources

The risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%). Water and land are not yet measured for our facilities, so those arcs render as "not yet measured" and the weights are renormalized over the factors we can source today — when the data lands, the score updates.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.