DataCentersExposed tracks 4 AI data centers in North Dakota — 3 operating and 0 in the pipeline — across 3 counties, drawing 600 MW of reported power demand from 0 tracked corporate operators. North Dakota's data-center tax break cost the state $19.4M in forgone revenue in FY2024 — $40.9M cumulatively.

Sources: Methodology, Coverage scorecard

DataCentersExposed tracks 4 data centers in North Dakota — 3 operating. The 1 North Dakota facilities with disclosed electrical capacity account for 600 MW of demand on the grid — power that competes with homes and businesses for the same generation and transmission.

Reporting by · Updated May 29, 2026

Tracked
4
data centers
Operating
3
live today
Pipeline
0
proposed / building
Demand
600 MW
1 w/ capacity
Counties
3
touched
Operators
0
corporate parents
The story so far

North Dakota at a glance

Geographically, the buildout clusters: Cass County leads North Dakota with 2 facilities and a composite risk score of 6/100. Dickey County and Stutsman County follow. Our county risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%); the full breakdown is shown on each county page.

Most of the North Dakota fleet we track is already operating, which shifts the public conversation from "should this be built" to scrutiny of the deals already struck — the tax abatements granted, the water permits issued, and the rate impacts now showing up on bills.

We also surface the accountability trail: 1 state bill mentioning data centers and 6 recent news items are tracked for North Dakota below, pulled from LegiScan and GDELT and refreshed automatically. Legislation is linked to the counties and operators it names; news is classified by community sentiment.

What the tax break costs

The taxpayer price tag

via North Dakota Legislative Council
$19.4Min forgone state revenue, FY2024
$40.9M cumulative (TY2021-TY2024)
The reported tax for the sales tax exemption for technology equipment and computer software used in a qualified data center totaled $12,359,395 in tax years 2021 and 2022 combined, $9,147,273 in tax year 2023, and $19,390,865 in tax year 20…

Program-wide cost of North Dakota's data-center tax incentive(s), reported by the state — not attributable to a single facility. “Proj” = the state's own forward estimate; all other figures are realized/audited. Each links to its primary source.

Where it's concentrated

County risk leaderboard

Risk methodology
CountyFacilitiesPipelineRisk
Cass County26
Dickey County14
Stutsman County14
4 of 4 shown

All tracked facilities

FacilityOperatorStatusCountyMW
Applied Digital / Ellendale Data CenterOperatingDickey600
Apld Jamestown DatacenterOperatingStutsman
Applied DigitalMapped (unverified)Cass
Dakota Carrier NetworkOperatingCass

Methodology & sources

Facility counts include operating, under-construction, proposed, and permitted sites. Capacity (MW) combines operator disclosures, interconnection-queue estimates, and research datasets; see each facility for provenance. County risk scores weight project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%), renormalized over measured factors.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.