Maine

DataCentersExposed tracks 2 AI data centers in Maine — 0 operating and 0 in the pipeline — across 1 county, drawing 5 MW of reported power demand from 1 tracked corporate operator.

Sources: Methodology, Coverage scorecard

DataCentersExposed tracks 2 data centers in Maine. The 1 Maine facilities with disclosed electrical capacity account for 5 MW of demand on the grid — power that competes with homes and businesses for the same generation and transmission.

Reporting by · Updated May 29, 2026

Tracked
2
data centers
Operating
0
live today
Pipeline
0
proposed / building
Demand
5 MW
1 w/ capacity
Counties
1
touched
Operators
1
corporate parents
The story so far

Maine at a glance

The largest footprint in Maine belongs to Prime Data Centers, behind 1 tracked facility. Many of these sites are filed under shell or project names rather than the parent's — our operator column resolves them back to the real corporate parent wherever the chain is documented.

Geographically, the buildout clusters: Cumberland County leads Maine with 2 facilities and a composite risk score of 6/100. Our county risk score weights project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%); the full breakdown is shown on each county page.

We also surface the accountability trail: 3 state bills mentioning data centers and 6 recent news items are tracked for Maine below, pulled from LegiScan and GDELT and refreshed automatically. Legislation is linked to the counties and operators it names; news is classified by community sentiment.

Data-center policy watch: Maine's legislature passed a statewide data-center moratorium (LD 307) in 2026, but the governor vetoed it.

Who's building

Top operators in Maine

Where it's concentrated

County risk leaderboard

Risk methodology
CountyFacilitiesPipelineRisk
Cumberland County26
2 of 2 shown

All tracked facilities

FacilityOperatorStatusCountyMW
FirstLight Data CenterPrime Data CentersMapped (unverified)Cumberland
Oxford NetworksMapped (unverified)Cumberland

Methodology & sources

Facility counts include operating, under-construction, proposed, and permitted sites. Capacity (MW) combines operator disclosures, interconnection-queue estimates, and research datasets; see each facility for provenance. County risk scores weight project exposure (40%), power demand (30%), water draw (15%), and land footprint (15%), renormalized over measured factors.

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.