xAI Colossus 2 — Southaven Turbine Plant

Stateline Road West · Southaven, DeSoto County, MS

Source: Primary source

xAI Colossus 2 — Southaven Turbine Plant is an operating data center in DeSoto County, MS, operated by xAI Corp.. DataCentersExposed has documented 500 MW of reported power capacity, a 812,955 sq ft footprint and 1 tracked EPA enforcement record at this site.

Reporting by · Updated Jun 12, 2026

Real parent
xAI Corp.
Operator
xAI Corp.
Power
500 MW
Footprint
812,955 sq ft
Utility
Coahoma Electric Power Assn
Grid
MISO
Attribution & capacity confidence:highprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

On-site gas-turbine power plant for xAI's second Colossus campus, in Southaven, Mississippi (DeSoto County), just across the state line from the Memphis data halls. By April 2026 it had grown from 27 to at least 46 turbines (~500 MW) operating with no Clean Air Act preconstruction (PSD) or Title V permit — a potential-to-emit of more than 1,700 tons/year of NOx, likely the largest industrial NOx source in greater Memphis. Title is held by MZX Tech LLC.

Operator chain

  • Ultimate parent
    xAI Corp.
  • This facility
    xAI Colossus 2 — Southaven Turbine Plant

The grid behind this site, right now

source: MISO · gridstatus
Clean right now
53%
Fossil right now
41%
Grid operator
MISO
  • Coal20.8%
  • Wind20.7%
  • Natural Gas19.9%
  • Solar18.2%
  • Nuclear14.6%
  • Imports4.0%
  • Other1.8%

Real-time generation mix for the MISO grid this site draws from, as of Jun 16, 2026, 2:45 PM. ISO-wide, not this facility's own metering. Source: gridstatus.

In the news

source: GDELT

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

Modeled estimate~10.4M gpd
Direct (onsite cooling)
~5.1M gpd
Indirect (its electricity)
~5.3M gpd

No measured record exists, so this is a low-confidence model from 500 MW (disclosed IT power): 2 L/kWh cooling (hot climate) + 0.55 gal/kWh embedded in MISO grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO
  • Clean Air Actno penalty
    significant · reported 2026-04-14

Air quality near this site

source: AirNow
42
PM2.5
Good
38
O3
Good

Air Quality Index from the nearest AirNow reporting area (Memphis), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$53.4K
People of color
48%
Below poverty
18%
Tract population
3,464

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, J. P. Freeman Elementary/Middle in Memphis, is 0.9 mi from this site (548 students). 2 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.