Mapped (unverified)colocation
WWZ Rechenzenter Zug
Zug, Zug, Switzerland
Source: Primary source
WWZ Rechenzenter Zug is a mapped data center in Zug, Switzerland. It runs on Switzerland's grid, which was 2% fossil-fuelled at 39 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
39 gCO₂/kWh
Clean electricity
98%
Region
Zug
Overview
source: linkWWZ Telekom AG — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
39 gCO₂/kWh
Clean electricity
98%
Fossil electricity
2%
National grid context, not this facility's own metering. Full country picture: Switzerland data centers.
In the news
source: Google News (local + English)- Siemens expands data center partner ecosystem to scale next-genera ...Siemens press· Mar 18, 2026
- Detroit gathering focuses on role of environmental justice in Michigan’s climate workPlanet Detroit· Jan 5, 2026
- Siemens to open data center hub in Spain to drive region’s digital developmentSiemens press· Jun 17, 2025
- Reinventing the edge: Siemens, Cadolto and Legrand introduce new m ...Siemens press· Jun 4, 2025
- The Pipeline: MEAG’s €1bn cheque, EIP sets up in Singapore, Patria’s $1bn data centre playInfrastructure Investor· Jun 2, 2025
- Gallery of Office and Data Center Waterworks Zug WWZ / Boltshauser Architekten - 33ArchDaily· Aug 15, 2022
See something wrong or missing on this page? Suggest a correction.