Mapped (unverified)colocation
WIIT Datacenter MUC8
Haar, Bayern, Germany
Source: Primary source
WIIT Datacenter MUC8 is a mapped data center in Bayern, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Bayern
Overview
source: linkWIIT Group (IT, DE, CH) — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- (S+) Rechenzentren: Wie Bürgerproteste milliardenschwere KI-Projekte bremsenSpiegel· May 24, 2026
- Weg frei für Rechenzentrum: Stadtrat kippt Stufenplan nach 14 JahrenMerkur· May 23, 2026
- Wie eine Microsoft-Netzwerkinnovation durch kostengünstige MicroLEDs die Rechenzentren effizienter machen willMicrosoft Source· Mar 18, 2026
- Kurzstrecken-Optik neu gedacht: MicroLEDs holen aufingenieur.de· Feb 24, 2026
- IT-Recht im All: Der Orbit als digitaler RechtsraumHeise Online· Jan 16, 2026
- Altbürgermeister Hans Wehrberger mit 84 Jahren gestorbenMerkur· Jan 16, 2026
See something wrong or missing on this page? Suggest a correction.