Wallonie Data Center (WDC) is a mapped data center in Wallonie, Belgium. DataCentersExposed has documented a 22,908 sq ft footprint at this site. It runs on Belgium's grid, which was 20% fossil-fuelled at 109 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~5-10 MW
Footprint
22,908 sq ft
Grid carbon
109 gCO₂/kWh
Clean electricity
80%
DC power price
16.13¢/kWh
Region
Wallonie
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
109 gCO₂/kWh
Clean electricity
80%
Fossil electricity
20%
Data-center power price
16.13¢/kWh
A large data center in Belgium pays 16.13¢/kWh for electricity — a household pays 33.13¢, 51% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Belgium data centers.