Virtus London2
United Kingdom
Source: OpenStreetMap
Virtus London2 is a mapped data center in United Kingdom, operated by VIRTUS Data Centres and ultimately owned by STT GDC. DataCentersExposed has documented a 66,632 sq ft footprint and 1 environmental-permit record at this site. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkVIRTUS LONDON2 is a mapped data center in the United Kingdom, operated by VIRTUS Data Centres and held through its ultimate parent, STT GDC. Its reported footprint is 66,632 square feet. Further operational details for the site are not disclosed in available records.
Operator chain
- Ultimate parentSTT GDC
- Files asVIRTUS Data Centres
- This facilityVirtus London2
The grid behind this site
source: Ember · EurostatNational grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- UK Data Center Market Size, Share & Forecast 2035Market Research Future· Apr 6, 2026
- VIRTUS bets on tier-two Europe in ‘speculative’ data centre expansionTelcoTitans.com· Mar 12, 2026
- Concerns raised over impact of new data centres on London’s energy supplyHaringey Community Press· Feb 5, 2026
- KKR and Singtel fully acquire data center firm STT GDCData Center Dynamics· Feb 4, 2026
- A S$13.8 billion data centre prize: Why KKR, Singtel and GIC want Temasek-backed STT GDCThe Business Times· Feb 2, 2026
- Digital Infra Peoplewatch: VIRTUS fills CEO role; Eutelsat selects connectivity leadTelcoTitans.com· Jan 15, 2026
Water use
- Permitted maximum55.5K gpd2023 · groundwater · reported as “Virtus Hayes Limited” · source
Environmental permits
source: Permit register- VIRTUS HAYES LIMITEDEPR/EP3247JVEPR permit · holder "VIRTUS HAYES LIMITED" · Hounslow · Combustion; Any Fuel =>50MW - 1.1 A(1) a) · within ~2 km of the mapped site