Skip to content
DataCentersExposed
Mapped (unverified)

Valley Forge Digital Utility Facility / Lower Providence

1000 ADAMS AVE · NORRISTOWN, Montgomery County, PA

Source: Primary source

Valley Forge Digital Utility Facility / Lower Providence is a mapped data center in Montgomery County, PA. DataCentersExposed has documented a 62,375 sq ft footprint and 1 tracked EPA enforcement record at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Operator
Est. capacity
~10-25 MW
Footprint
62,375 sq ft
Utility
Peco Energy Co
Grid
PJM
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Valley Forge Digital Utility Facility, also tracked as Lower Providence, is a mapped data center in Norristown, Montgomery County, Pennsylvania, with a reported footprint of 62,375 square feet. State records list 1 tracked environmental enforcement record tied to the site. It draws power from Peco Energy Co inside the PJM grid. Operator and ultimate ownership are not disclosed in available records.

In the news

source: GDELT

Data-center discussions in Montgomery County

source: LocalView (CC0)

Local-government meetings in this county that discussed data centers, each cued to the moment. From the public LocalView corpus of government meetings on YouTube — a county-level signal, not necessarily about this specific site.

Norristown City Council
Dec 6, 2016 · 2 data-center mentions

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO
  • Clean Air Actno penalty
    formal · reported 2024-11-01

Environmental permits

source: Permit register
  • Clean Air Act permitted sourcePA000752433
    NAICS 518210; ECHO compliance status: No Violation Identified

What this site costs the grid

source: PJM RPM auction reports
PJM RTO (rest of footprint) · 2027/28 auction
$333 /MW-day

PJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's RTO pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →

This site's capacity-market cost (estimated)
$1.2M to $3M/yr

An estimated ~10 to 25 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.

Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →

Air quality near this site

source: AirNow
71
PM2.5
Moderate
47
O3
Good
14
PM10
Good

Air Quality Index from the nearest AirNow reporting area (Philadelphia), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$73.5K
People of color
11%
Below poverty
5%
Tract population
3,281

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Woodland El Sch in Norristown, is 1.2 mi from this site (428 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.