Tier IV
Roma, Lazio, Italy
Source: OpenStreetMap
Tier IV is a mapped data center in Lazio, Italy, operated by TIM. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkTIER IV is a mapped data center in Roma, Italy, run by TIM. Available records identify it as a TIM data center but disclose no ultimate parent, capacity, or footprint figures. Its current operational details remain undocumented in the facts on file.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Italy data centers.
In the news
source: Google News (local + English)- Invasione dei data center in Piemonte, presentate oltre 70 richieste. La Regione ora frena: «Non si possono dare permessi a tutti»Corriere Torino· Jun 10, 2026
- Cybersecurity, un polo nazionale da oltre 2 miliardi e 800 impreseIl Messaggero· Jun 9, 2026
- Il governo incontra Tim: "San Marino prima “smart nation” digitale d’Europa"San Marino Rtv· May 21, 2026
- San Marino accelera a Roma con TIM per diventare la prima "smart nation" d'EuropaSan Marino Rtv· May 21, 2026
- L’autostrada quantistica: da Napoli a Roma la prima rete di comunicazione a lunga distanzaInnovation Post· Mar 25, 2026
- Da Poste e Tim un big che mira a diventare polo leader del tech e dei serviziIl Sole 24 ORE· Mar 24, 2026