Mapped (unverified)
Teraco JB3 Isando Campus
Isando, Gauteng, South Africa
Source: OpenStreetMap
Teraco JB3 Isando Campus is a mapped data center in Gauteng, South Africa. DataCentersExposed has documented a 194,512 sq ft footprint at this site. It runs on South Africa's grid, which was 82% fossil-fuelled at 699 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~35-80 MW
Footprint
194,512 sq ft
Grid carbon
699 gCO₂/kWh
Clean electricity
18%
Region
Gauteng
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
699 gCO₂/kWh
Clean electricity
18%
Fossil electricity
82%
National grid context, not this facility's own metering. Full country picture: South Africa data centers.
In the news
source: Google News (local + English)- The quiet boom in SA’s giant data centresNews24· Nov 10, 2025
- Teraco data centre now largest in Africagadget.co.za· Aug 13, 2025
- Teraco completes JB5 data center in Johannesburg, South AfricaData Center Dynamics· Jun 8, 2025
- Biggest data centres in South AfricaMyBroadband· May 12, 2025
- Teraco to build 40 MW JB7 data centre at Isando CampusEngineering News· Nov 29, 2024
- Teraco commences construction on a new hyperscale data centre in South AfricaGreen Building Africa· Nov 15, 2024