Teraco JB2 Bredell Campus
Gauteng, South Africa
Source: OpenStreetMap
Teraco JB2 Bredell Campus is a mapped data center in Gauteng, South Africa. DataCentersExposed has documented a 321,121 sq ft footprint at this site. It runs on South Africa's grid, which was 82% fossil-fuelled at 699 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~60-130 MW
Footprint
321,121 sq ft
Grid carbon
699 gCO₂/kWh
Clean electricity
18%
Region
Gauteng
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
699 gCO₂/kWh
Clean electricity
18%
Fossil electricity
82%
National grid context, not this facility's own metering. Full country picture: South Africa data centers.
In the news
source: Google News (local + English)- [South Africa] Teraco completes JB4, the latest hyperscale data centre expansion to the Bredell CampusAfrica Business Communities· Feb 28, 2026
- Teraco data centre now largest in Africagadget.co.za· Aug 13, 2025
- Teraco JB4 Expansion: Meet Africa’s Largest Data CentreData Centre Magazine· Aug 12, 2025
- South Africa's Teraco launches second phase of JB4 data center campus in Jo'burgData Center Dynamics· Aug 12, 2025
- Biggest data centres in South AfricaMyBroadband· Mar 11, 2025