Mapped (unverified)
Telekom Data-Center
Bayern, Germany
Source: OpenStreetMap
Telekom Data-Center is a mapped data center in Bayern, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Bayern
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Global Foundries und Telekom kooperieren für Produktion und Datenverarbeitung „Made in Europe“DataCenter-Insider· May 8, 2026
- Telekom-KI-Fabrik: ein Vorzeigeprojekt mit WarnfunktionDataCenter-Insider· Feb 6, 2026
- Deutsche Telekom eröffnet Riesendatacenter in Münchenmünchen.tv· Feb 5, 2026
- Telekom eröffnet KI-Fabrik Made in Germanyit-business· Feb 5, 2026
- Telekom eröffnet Rechenzentrum in München mit 10.000 GrafikprozessorenFAZ· Feb 4, 2026
- KI-Power aus München: Telekom eröffnet Europas modernstes RechenzentrumFOCUS online· Feb 4, 2026