Switch Datacenters AMS2
Utrecht, Netherlands
Source: OpenStreetMap
Switch Datacenters AMS2 is a mapped data center in Utrecht, Netherlands. DataCentersExposed has documented a 28,614 sq ft footprint at this site. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatA large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Switch Datacenters start Datacenter-as-a-ServiceComputable.nl· Jan 31, 2018
- Switch Datacenters realiseert 10 GbE dark fiber interconnects tussen zijn datacenters in Amsterdam Zuidoost en WoerdenEmerce· Jun 9, 2016
- Switch Datacenters details 90MW Warsaw data centerData Center Dynamics· Jul 31, 2025
- Iron Mountain linked to data center development in North Holland – reportBeBeez International· Feb 22, 2025
- Dutch operator Switch Datacenters expands into Poland, plans 30MW Warsaw data centerData Center Dynamics· Oct 11, 2024
- The ongoing impact of Amsterdam's data center moratoriumData Center Dynamics· Aug 22, 2024