Skip to content
DataCentersExposed
Operating

Strata Networks

67 North Vernal Avenue · Vernal, Uintah County, UT

Source: OpenStreetMap

Strata Networks is an operating data center in Uintah County, UT. DataCentersExposed has documented a 12,971 sq ft footprint at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Operator
Footprint
12,971 sq ft
Utility
Moon Lake Electric Assn INC
Grid
WACM
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

data center

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
45
O3
Good
16
PM2.5
Good

Air Quality Index from the nearest AirNow reporting area (Vernal), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$52.2K
People of color
25%
Below poverty
18%
Tract population
3,827

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Uintah Specialized Preschool in Vernal, is 0.3 mi from this site (185 students). 4 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.