CyrusOne Stafford Campus
Stafford County, VA
CyrusOne Stafford Campus is a permitted data center in Stafford County, VA, operated by CyrusOne LLC. DataCentersExposed has documented 250 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Take action
Stafford, Virginia
A public decision is in play. This is exactly the moment that changes outcomes — show up and speak.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
250 MW of new demand — roughly a city of 200,000 homes.
Large new loads can raise transmission and capacity costs that land on every ratepayer. Residential power in VA is 17.1¢/kWh, up 14.5% year-over-year. (MW→homes is a rough ~800/MW planning figure.)
SourceDemand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
CyrusOne Stafford Campus is a permitted colocation data center in Stafford County, Virginia, operated by CyrusOne LLC. Proposed in 2024, the project carries a reported power capacity of 250 MW, drawing electricity from Virginia Electric & Power Co within the PJM grid. The campus remains in the permitting stage and is not yet operating.
Operator chain
- Ultimate parentCyrusOne LLC
- This facilityCyrusOne Stafford Campus
In the news
source: GDELTTax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to CyrusOne LLC (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project Exemption$0State of Texas · granted 2022 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2017 · term — yr · source
- Texas Qualifying Data Center Exemption$0State of Texas · granted 2016 · term — yr · source
Virginia reported $1B in Data Center Retail Sales and Use Tax Exemption (Va. Code § 58.1-609.3(18)) for FY2024 (Virginia Joint Legislative Audit and Review Commission (JLARC) / Weldon Cooper Center). Program-wide, not attributable to this site.
Water use
No measured record exists, so this is a low-confidence model from 250 MW (disclosed IT power): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's DOM pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
250 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Colonial Forge High in Stafford, is 1.1 mi from this site (1,996 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.