SFR Netcenter Bordeaux
Bordeaux, Nouvelle-Aquitaine, France
Source: OpenStreetMap
SFR Netcenter Bordeaux is a mapped data center in Nouvelle-Aquitaine, France. DataCentersExposed has documented a 41,520 sq ft footprint at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~5-20 MW
Footprint
41,520 sq ft
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Nouvelle-Aquitaine
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Pas encore sorti de terre, le projet de data center géant en Gironde inquiète déjà les habitantsFrance 3 Régions· Jun 13, 2026
- Gironde : Un géant data center 4x plus puissant que le plus grand data center de France s'installe bientôt 🤯Quoi Faire à Bordeaux· Jun 10, 2026
- À 30 km de Bordeaux, ce monstre numérique 4X plus puissant que le plus grand data center français pourrait voir le jour dès 2028AquitaineOnLine· Jun 9, 2026
- Supercalculateur à Bordeaux : la Métropole ouvre la voie au projet de « pôle numérique souverain »Sud Ouest· May 26, 2026
- Grâce aux microalgues, une société girondine transforme le COSud Ouest· Apr 29, 2026
- Centres de données : UltraEdge lance à Bordeaux son maillage régional à 400 millions d’eurosLa Tribune· Mar 11, 2026