Serverfarm - LAX1
444 North Nash Street · El Segundo, Los Angeles County, CA
Source: OpenStreetMap
Serverfarm - LAX1 is an operating data center in Los Angeles County, CA. DataCentersExposed has documented a 119,102 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkLAX1 is an operating data center in El Segundo, Los Angeles County, California, run by Serverfarm LLC. The site covers a reported 119,102 square feet. It draws power from Southern California Edison Co within the CISO balancing authority. Ownership above Serverfarm LLC is not disclosed in available records.
The grid behind this site, right now
source: CAISO · gridstatus- Solar62.2%
- Imports12.0%
- Wind7.6%
- Nuclear6.5%
- Natural Gas4.3%
- Hydro4.0%
- Geothermal2.2%
- Biomass1.2%
Real-time generation mix for the CAISO grid this site draws from, as of Jun 16, 2026, 4:35 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
In the news
source: Google News- News | Link Logistics sells LA data center as demand grows for existing AI networksCoStar· Jun 15, 2026
- The Redesign Group Named Dell Technologies’ 2026 North American Data Center Partner of the Yearstandard-journal.com· Jun 1, 2026
- Fight over AI data centers grows in LA CountySpectrum News NY1· May 1, 2026
- Amphenol forecasts upbeat quarterly results on AI data center demandReuters· Apr 29, 2026
- Texas Instruments Q1 FY 2026: Data Center and Industrial Demand Lift OutlookThe Futurum Group· Apr 27, 2026
- Microsoft's Data Center Footprint Reflects AI Demand: What's Ahead?Yahoo Finance· Apr 20, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Da Vinci Science in El Segundo, is 0.3 mi from this site (560 students). 6 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.