Mapped (unverified)colocation
Servanet FRG5
Sundsvall, Västernorrlands län, Sweden
Source: Primary source
Servanet FRG5 is a mapped data center in Västernorrlands län, Sweden. It runs on Sweden's grid, which was 1% fossil-fuelled at 35 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
35 gCO₂/kWh
Clean electricity
99%
DC power price
7.47¢/kWh
Region
Västernorrlands län
Overview
source: linkSundsvall Energi Elnat AB — colocation facility (6 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
35 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
7.47¢/kWh
A large data center in Sweden pays 7.47¢/kWh for electricity — a household pays 23.51¢, 68% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Sweden data centers.
In the news
source: Google News (local + English)- Datacenter i Torsboda kan kräva el som hela StockholmSveriges Radio· Jun 18, 2026
- Professorn om Googles datacenter i TorsbodaSveriges Radio· Jun 18, 2026
- 2000 nya Googlejobb i Torsboda ser ut att bli 500Sveriges Radio· Jun 18, 2026
- Google köper Torsbodabolaget för datacenter i TimråSveriges Radio· Jun 18, 2026
- Oenighet om storsatsningen: ”Alla ägg i en korg”Sundsvalls Tidning· Jun 18, 2026
- Här vill Google bygga nytt datacenterByggvärlden· Jun 18, 2026
See something wrong or missing on this page? Suggest a correction.