Mapped (unverified)
rockenstein AG
Veitshöchheim, Bayern, Germany
Source: OpenStreetMap
rockenstein AG is a mapped data center in Bayern, Germany. DataCentersExposed has documented a 21,772 sq ft footprint at this site. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~5-10 MW
Footprint
21,772 sq ft
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Bayern
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Homepage | Video: Schlüsselübergabe in WürzburgDeutsche Rentenversicherung· May 29, 2026
- Brand im Gebäude der Deutschen Rentenversicherung am Heuchelhof in Würzburg: Drei Menschen verletztMain-Post· Jul 4, 2025
- Relaunch der Uni-Website: Ideen aus der gesamten Uni sind gefragt!Universität Würzburg· Apr 29, 2025
- Die rockenstein AG, ein bedeutender Player der digitalen Transformation, feierte ganz groß die Fertigstellung des neuen Büro- und Rechenzentrumgebäudes im Veitshöchheimer GewerbegebietVeitshöchheim News· Jun 25, 2023
- Bilder kostenlos und rechtssicherUniversität Würzburg· Apr 3, 2023
- Neuer Klinik-Campus: Vergabe des Generalplaner-Auftrags für Uniklinik Würzburgkma Online· Jun 17, 2022