Mapped (unverified)colocation
Retelit Avalon 1
Milan, Lombardia, Italy
Source: Primary source
Retelit Avalon 1 is a mapped data center in Lombardia, Italy, operated by Retelit. It runs on Italy's grid, which was 51% fossil-fuelled at 285 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
Retelit
Operator
Retelit
Grid carbon
285 gCO₂/kWh
Clean electricity
49%
DC power price
18.69¢/kWh
Region
Lombardia
Overview
source: linkRetelit S.p.A. — colocation facility (137 networks present). Source: PeeringDB.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
285 gCO₂/kWh
Clean electricity
49%
Fossil electricity
51%
Data-center power price
18.69¢/kWh
A large data center in Italy pays 18.69¢/kWh for electricity — a household pays 31.11¢, 40% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Italy data centers.
In the news
source: Google News (local + English)- Milano hub digitale e dei data center in ItaliaGazzettadiMilano.it· Mar 19, 2026
- ING e Unicredit nel ruolo di Global Coordinator per il finanziamento da 375 milioni di euro a Retelit, destinato a sostenere l'espansione della piattaforma nazionale per l’interconnessione dei data centerBanca ING· Mar 19, 2026
- Retelit Datacenter (Asterion-Marguerite) ottiene finanziamento da 375 mln. Di questi, 175 mln arrivano da Infranity (Generali Investments)BeBeez· Mar 18, 2026
- La guerra ai data center in LombardiaIl Foglio· Feb 28, 2026
- Egm ai raggi X: Intred, nuovo data center a Brescia nell’ex area Ideal StandardIl Sole 24 ORE· Feb 23, 2026
- Retelit punta sui data center a Milano: investimento di 100 milioni per realizzare due hub in zona BisceglieMilano Finanza· Feb 4, 2026
See something wrong or missing on this page? Suggest a correction.