Rechenzentrum Nürnberg Süd
Bayern, Germany
Source: OpenStreetMap
Rechenzentrum Nürnberg Süd is a mapped data center in Bayern, Germany, operated by noris network. DataCentersExposed has documented a 487,998 sq ft footprint at this site. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkRechenzentrum Nürnberg Süd is a noris network data center in Bavaria, Germany, operated by noris network. The mapped site covers 487,998 square feet. The verified records do not name an ultimate corporate parent for the operator, leaving the ownership chain behind the facility unconfirmed in the available data.
Operator chain
- Ultimate parentnoris network
- Files asnoris network
- This facilityRechenzentrum Nürnberg Süd
The grid behind this site
source: Ember · EurostatA large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Noris Network legt Grundstein für Frankfurter RechenzentrumIT Finanzmagazin· Jun 15, 2026
- Noris Network investiert 160 Millionen Euro in neues Rechenzentrumfnp.de· May 20, 2026
- Jetzt doch! Noris baut Rechenzentrum in FrankfurtDataCenter-Insider· Apr 23, 2026
- noris network baut 30-Megawatt-Rechenzentrumit-daily· Apr 15, 2026
- Noris Network baut Rechenzentrum mit Leo Schmidt-Hollburgjuve.de· Dec 18, 2025
- Core Banking mit Souveränität: Sichere IT-Infrastruktur für regulierte FinanzinstituteIT Finanzmagazin· Nov 16, 2025