QTS Boone County Campus
Boone County, IN
QTS Boone County Campus is a mapped data center in Boone County, IN, operated by QTS Realty Trust, LLC. DataCentersExposed has documented 240 MW of reported power capacity at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
QTS Boone County Campus is a hyperscale data center in Boone County, Indiana, operational since 2022 and run by QTS Realty Trust, LLC. The site draws a reported 240 MW of power, served by the City of Lebanon and connected to the MISO grid.
Operator chain
- Ultimate parentQTS Realty Trust, LLC
- This facilityQTS Boone County Campus
The grid behind this site, right now
source: MISO · gridstatus- Coal20.8%
- Wind20.7%
- Natural Gas19.9%
- Solar18.2%
- Nuclear14.6%
- Imports4.0%
- Other1.8%
Real-time generation mix for the MISO grid this site draws from, as of Jun 16, 2026, 2:45 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
In the news
source: Google News- Blackstone’s QTS Eyes $1.3B Data Center RefiCommercialSearch· Jun 8, 2026
- Blackstone data center REIT raises $1.75 billion in US IPOReuters· May 13, 2026
- Blackstone's data center REIT raises $1.75 billion through US IPOBitget· May 13, 2026
- Blackstone Launches IPO for Data Center REITThe Real Deal· May 5, 2026
- Blackstone Targets $1.75B IPO For Data Center REITBisnow· May 4, 2026
- Developers seek to revive data center next to Virginia battlefieldE&E News by POLITICO· May 1, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No measured record exists, so this is a low-confidence model from 240 MW (disclosed IT power): 1.8 L/kWh cooling (temperate climate) + 0.55 gal/kWh embedded in MISO grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Indianapolis), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Central Elementary School in Lebanon, is 900 ft from this site (337 students). 3 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.