PSE&G Delivery Emergency Response Center
Somerset County, NJ
Source: OpenStreetMap
PSE&G Delivery Emergency Response Center is a mapped data center in Somerset County, NJ. DataCentersExposed has documented a 85,030 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkThe PSE&G Delivery Emergency Response Center is a mapped data center in Somerset County, New Jersey, tied to Public Service Electric & Gas Co, which also serves as its electric utility. Public records put its footprint at 85,030 square feet. The site sits inside the PJM grid.
In the news
source: Google News- Sherrill keeps her promise to take action against N.J.’s soaring electric rates. But is it enough?NJ.com· Jan 20, 2026
- PSEG could offer lower rates to New Jersey’s incoming governor: equity analystsUtility Dive· Nov 6, 2025
- Bridgewater approves PSE&G Data Center; access road plan withdrawnCentral New Jersey News· Oct 25, 2016
- PSE&G to build data center on Route 22 in BridgewaterCentral New Jersey News· Sep 25, 2016
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's PSEG pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~15 to 35 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (North Central), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Hazelwood Elementary School in Middlesex, is 0.4 mi from this site (239 students). 4 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.