Project Quest
INTERSECTION OF LOOP ROAD AND ROCKDALE ROAD · STAMFORD, JONES COUNTY County, TX
Source: Primary source
Project Quest is an operating data center in JONES COUNTY County, TX.
Reporting by Eric Keller · Updated Jun 16, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkNo description yet.
In the news
source: Google News- Building data centers in space is an intriguing idea on paper, but major engineering challenges must be solvedStamford Advocate· Jun 16, 2026
- SpaceX buys AI coding startup Cursor for $60 billion in race for an edge over Anthropic and OpenAIStamford Advocate· Jun 16, 2026
- How Pennsylvania towns are protecting themselves from the noise, heat and utility costs of massive data centersStamford Advocate· Jun 11, 2026
- Sphere 3D to Present at Architecting Tomorrow: The AI Data Center Summit Presented by Maxim Group LLCTMX Newsfile· Jun 8, 2026
- Donald Trump, Bernie Sanders and Sam Altman are all talking about public ownership in AIStamford Advocate· Jun 6, 2026
- Ohio suspends data center tax break as tech firms face pressure to pay the cost to power AIStamford Advocate· May 28, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Environmental permits
source: Permit register- PROJECT QUESTTXR1560XW
Nearest school
source: HIFLD / NCESThe nearest public school, Oliver El in Stamford, is 3.1 mi from this site (303 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.