Project Jade Data Center Campus (Cheyenne) is a proposed data center in Laramie County, WY. DataCentersExposed has documented 1,800 MW of reported power capacity at this site.

Reporting by · Updated Jun 13, 2026

Real parent
Operator
Power
1,800 MW
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Approved ~1.8GW (expandable to 2.7GW) gas-powered AI data-center campus south of Cheyenne (Laramie County), developed with Tallgrass Energy; founding partner Crusoe withdrew and development is paused. Announced investment: $40.0B. Discovered from news coverage and promoted after review; details to be enriched from primary sources.

In the news

source: GDELT

Data-center discussions in Laramie County

source: LocalView (CC0)

Local-government meetings in this county that discussed data centers, each cued to the moment. From the public LocalView corpus of government meetings on YouTube — a county-level signal, not necessarily about this specific site.

Laramie City Council
Sep 17, 2019 · 1 data-center mention

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Wyoming reported $15.2M in Sales/use tax exemption for qualifying data processing services centers (W.S. § 39-15-105(a)(viii)(S)) for FY2021 (Wyoming Department of Revenue, Excise Tax Division (report to Joint Revenue Interim Committee)). Program-wide, not attributable to this site.

source · All Wyoming subsidies →

Water use

Modeled estimate~26.5M gpd
Direct (onsite cooling)
~11M gpd
Indirect (its electricity)
~15.6M gpd

No measured record exists, so this is a low-confidence model from 1,800 MW (disclosed IT power): 1.2 L/kWh cooling (cool climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, Afflerbach Elementary in Cheyenne, is 0.6 mi from this site (353 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.