Mapped (unverified)colocation
PlusServer DataCore Köln
Cologne, Nordrhein-Westfalen, Germany
Source: Primary source
PlusServer DataCore Köln is a mapped data center in Nordrhein-Westfalen, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Nordrhein-Westfalen
Overview
source: linkPlusServer GmbH — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Professur für Clinical Computational Cancer Biology (W3) (w/m/d) - Universität zu Köln - Medizinische Fakultätacademics.de· Jun 5, 2026
- Neues Rechenzentrums-Cluster stärkt die digitale Infrastruktur in DeutschlandDie Wirtschaft Köln· Apr 4, 2026
- Microsoft eröffnet KI-Rechenzentren in BraunkohleregionZDFheute· Mar 13, 2026
- Microsoft startet Bauarbeiten für großes RechenzentrumWDR· Mar 12, 2026
- Rechenzentrums-Standort zwischen Köln und Bonn in PlanungDataCenter-Insider· Mar 10, 2026
- Strombedarf von Köln für ein Jahr: Sam Altman will Fabrik bauen, die pro Woche 1 Gigawatt KI-Infrastruktur herstelltBusiness Insider Deutschland· Oct 8, 2025
See something wrong or missing on this page? Suggest a correction.