Pier Data Centre
Western Australia, Australia
Source: OpenStreetMap
Pier Data Centre is a mapped data center in Western Australia, Australia, operated by DC Alliance. DataCentersExposed has documented a 38,790 sq ft footprint at this site. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkPier Data Centre is a mapped data center in Australia operated by DC Alliance. Available records put its footprint at 38,790 square feet. No ultimate parent company is disclosed in the available records, leaving the ownership above DC Alliance unclear.
Operator chain
- Ultimate parentDC Alliance
- Files asDC Alliance
- This facilityPier Data Centre
The grid behind this site
source: Ember · EurostatNational grid context, not this facility's own metering. Full country picture: Australia data centers.
In the news
source: Google News (local + English)- AI drives data centre power demand surge in AustraliaIT Brief Australia· Jun 11, 2026
- Singaporean former phosphate mining company AsiaPhos proposes acquisition of data center in Perth, AustraliaData Center Dynamics· Jun 9, 2026
- AsiaPhos to acquire Perth data centre in pivot to digital infrastructureW.Media· Jun 9, 2026
- Figtree Holdings to Dispose 51% Stake in DC Alliance, Anticipates Positive Financial Impact for 2026Minichart· Jun 8, 2026
- Figtree to Halve Stake in DC Alliance as Data Centre Unit Changes HandsTipRanks· Jun 8, 2026
- Asiaphos to acquire majority stake in DC Alliance, expanding into data centresSingapore Business Review· Jun 8, 2026