Mapped (unverified)
Pi Datacenters Amaravati
Andhra Pradesh, India
Source: OpenStreetMap
Pi Datacenters Amaravati is a mapped data center in Andhra Pradesh, India. DataCentersExposed has documented a 57,908 sq ft footprint at this site. It runs on India's grid, which was 73% fossil-fuelled at 671 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~10-25 MW
Footprint
57,908 sq ft
Grid carbon
671 gCO₂/kWh
Clean electricity
27%
Region
Andhra Pradesh
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
671 gCO₂/kWh
Clean electricity
27%
Fossil electricity
73%
National grid context, not this facility's own metering. Full country picture: India data centers.
In the news
source: Google News (local + English)- Pi Data Centers developing 23MW data center in Mumbai, IndiaData Center Dynamics· Apr 15, 2026
- Pi Data Centers, JLL Partner on 23MW AI Ready ExpansionRealty Plus Magazine· Apr 14, 2026
- Pi Data Centers to launch 3MW data centre in AugustET Telecom· Apr 13, 2026
- Pi Data Centers to launch Mumbai facility, partners JLL for India expansionBusiness Standard· Apr 13, 2026
- Pi Data Centers launches new DC in Mumbai, plans 23 MW expansion across IndiaW.Media· Apr 13, 2026
- Pi Data Centers partners JLL to launch 3 MW Mumbai facility by AugustTechcircle· Apr 13, 2026