Penta Infra Geleen GLN01
Geleen, Limburg, Netherlands
Source: Primary source
Penta Infra Geleen GLN01 is a mapped data center in Limburg, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Limburg
Overview
source: linkPenta C.V. — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Veertig Limburgse apotheken slachtoffer van grote brand in datacenter AlmereDe Limburger· May 7, 2026
- Penta Infra neemt KPN-datacenter Haarlem overComputable.nl· Dec 20, 2023
- Arcadiz regelt high-end connectiviteit voor CegekaDutch IT Channel· Apr 15, 2023
- Cegeka bouwt nieuw datacenter in Sittard-GeleenDutch IT Channel· Apr 10, 2023
- Tientallen gemeenten schakelen kwetsbare Citrix-servers uitSittard-Geleen.nieuws.nl· Jan 18, 2020
- Transavia besteedt IT-infrastructuur uit aan Cegekacomputable.be· Feb 8, 2017
See something wrong or missing on this page? Suggest a correction.