Mapped (unverified)colocation
Penta Infra Amsterdam AMS01
Haarlem, Noord-Holland, Netherlands
Source: Primary source
Penta Infra Amsterdam AMS01 is a mapped data center in Noord-Holland, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Noord-Holland
Overview
source: linkPenta C.V. — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Haarlem is miljoenen extra kwijt aan laptops en smartphones voor ambtenaren. ’Opkomst AI doet prijzen stijgen’Noordhollands Dagblad· Jun 3, 2026
- Datacenter in Vijfhuizen moet nog negen jaar wachten op stroomaansluiting, boze investeerder vist achter het netHaarlems Dagblad· Apr 30, 2026
- Netbeheerder hoeft datacenter niet aan te sluiten op overvol stroomnetNU· Apr 29, 2026
- Netbeheerder Tennet hoeft datacenter niet direct aan te sluiten op overvol stroomnetNOS· Apr 29, 2026
- Datacenter stapt naar rechter om stroom: aansluiting of dwangsomNOS· Apr 18, 2026
- Haarlemmermeer wil datacenterbeleid evalueren en ’repareren’. Voor tien meter hoge datacenter in aanbouw is dit te laat, onderzoek volgtHaarlems Dagblad· Feb 15, 2026
See something wrong or missing on this page? Suggest a correction.