NorthC Rotterdam Zestienhoven 1&2 is a mapped data center in Zuid-Holland, Netherlands, operated by NorthC. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkNorthC Rotterdam Zestienhoven 1&2 is a mapped data center in Rotterdam, Netherlands, operated by NorthC. Available records identify it as a NorthC data center but disclose no ultimate parent, capacity, or environmental enforcement history.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Brand bij datacenter in Almere onder controle, laatste brandhaard geblustde Stentor· May 7, 2026
- NorthC Datacenters: regionale slagkracht met Europese reikwijdteComputable.nl· Mar 25, 2026
- Overname NorthC Datacenters door Franse investeerder is afmena.nl· Mar 20, 2026
- Antin neemt NorthC Datacenters over van DWSVastgoedmarkt· Dec 12, 2025
- NorthC koopt datacenter Colt Amsterdam, maar niet locatie RoosendaalComputable.nl· Apr 17, 2025
- Juvoly lanceert Nvidia-cluster voor soevereine ai in de zorgComputable.nl· Mar 11, 2025