NorthC Nürnberg 1
Nürnberg, Bayern, Germany
Source: OpenStreetMap
NorthC Nürnberg 1 is a mapped data center in Bayern, Germany, operated by NorthC. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkNorthC Nürnberg 1 is a mapped data center in Nürnberg, Germany, operated by NorthC. Available records identify it as a NorthC data center but disclose no capacity, footprint, or ultimate parent. Further details on ownership and environmental impact are not listed in the available record.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- „Wir sind kein Hyperscaler. Und das ist unser Vorteil“DataCenter-Insider· Mar 23, 2026
- AEW kauft Rechenzentrum in Nürnberg von AventosDataCenter-Insider· Feb 24, 2026
- Data-Center für die Region: NorthC will ab 2026 im Gewerbegebiet bauenOP Online· Jul 12, 2025
- Ein 1,2-PUE-Wert im Bestandsrechenzentrum von Scale-UpDataCenter-Insider· Jun 12, 2025
- Colt Technology Services verkauft Rechenzentren an NorthCChannelPartner.de· Apr 25, 2025
- Scaleup Technologies übernimmt Rechenzentrum in Nürnberg-FürthDataCenter-Insider· Jan 27, 2025