Skip to content
DataCentersExposed
Mapped (unverified)

NorthC München 2

München, Bayern, Germany

Source: OpenStreetMap

NorthC München 2 is a mapped data center in Bayern, Germany, operated by NorthC. DataCentersExposed has documented a 51,990 sq ft footprint at this site. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
NorthC
Operator
NorthC
Est. capacity
~10-25 MW
Footprint
51,990 sq ft
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Bayern
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

NorthC München 2 is a mapped data center in München, Germany, operated by NorthC. Available records put its footprint at 51,990 square feet. Ownership above NorthC is not disclosed in the facts on file, and no operational details beyond its mapped status are recorded.

Operator chain

  • Ultimate parent
    NorthC
  • Files as
    NorthC
  • This facility
    NorthC München 2

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh

A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: Germany data centers.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.