nLighten data center, Bourgogne-Franche-Comté, France

Bourgogne-Franche-Comté, France

Source: OpenStreetMap

nLighten data center in Bourgogne-Franche-Comté, France is a mapped facility, operated by nLighten. DataCentersExposed has documented a 18,265 sq ft footprint and 1 environmental-permit record at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
nLighten
Operator
nLighten
Est. capacity
~5-10 MW
Footprint
18,265 sq ft
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Bourgogne-Franche-Comté
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

nLighten is a mapped data center in France, run by the operator nLighten. Available records list a footprint of 18,265 square feet. Ownership above nLighten is not disclosed in the facts on hand, and no further operational details have been recorded for the site.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh

A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: France data centers.

Environmental permits

source: Géorisques (ICPE)
  • SYBERT UIOM0005902597
    ICPE Autorisation · Besançon 25000 · registered as "SYBERT UIOM" · ~153 m from the mapped location · IED

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.