Iver 3 Ark Estates
United Kingdom
Source: Primary source
Iver 3 Ark Estates is a proposed data center in United Kingdom, operated by Ark Data Centres. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Take action
A public decision is in play. This is exactly the moment that changes outcomes — show up and speak.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
Demand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Overview
source: linkProposed transmission demand connection on NESO's Existing Agreements (Gate 2) register: 435 MW at Uxbridge Moor (Iver B 132kV), indicative connection date 2029. A connection agreement is not planning permission — it shows who has reserved grid capacity for a data center.
Operator chain
- Files asArk Data Centres
- This facilityIver 3 Ark Estates
The grid behind this site
source: Ember · EurostatNational grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Ark to invest GBP £807m in Surrey data centre expansionIT Brief UK· Jun 15, 2026
- Europe Data Center Industry: $148 Billion Market Opportunity, Including $58 Billion in Construction Investments by 2031 - AriztonThe Malaysian Reserve· Jun 10, 2026
- Ark DC to add new building to Longcross data center campus outside London, UKData Center Dynamics· Jun 9, 2026
- How Ark Data Centres is building the future of sustainable AI infrastructureManufacturing Today· Jun 2, 2026
- Police seize £1.2m worth of equipment during raid of data center in Farnborough, UK - DCDData Center Dynamics· Jun 1, 2026
- Nebius Scales AI Infrastructure Across Ark's Surrey CampusData Centre Magazine· May 27, 2026