Microsoft West Jordan

West Jordan, Salt Lake County, UT

Microsoft West Jordan is a mapped data center in Salt Lake County, UT, operated by Microsoft Data Center LLC and ultimately owned by Microsoft Corporation. DataCentersExposed has documented 220 MW of reported power capacity at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Microsoft Corporation
Operator
Microsoft Data Center LLC
Power
220 MW
Utility
Pacificorp
Grid
PACW, PACE
Attribution & capacity confidence:mediumprovenance JSON
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

Microsoft West Jordan is a hyperscale data center in West Jordan, Salt Lake County, Utah, operated by Microsoft Data Center LLC and ultimately owned by Microsoft Corporation. Operational since 2017, the site reports a power capacity of 220 MW, drawing electricity from Pacificorp within the PACW and PACE balancing authorities.

Operator chain

Data-center discussions in Salt Lake County

source: LocalView (CC0)

Local-government meetings in this county that discussed data centers, each cued to the moment. From the public LocalView corpus of government meetings on YouTube — a county-level signal, not necessarily about this specific site.

West Jordan City Council
Jan 9, 2019 · 11 data-center mentions
West Jordan City Council
Jul 13, 2016 · 5 data-center mentions
West Jordan City Council
Nov 4, 2020 · 3 data-center mentions

Tax breaks & subsidies

source: Good Jobs First / GASB 77

These tax breaks are recorded to Microsoft Corporation (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.

Dollar value not disclosed for these records.
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2024 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2023 · term yr · source
  • Qualified Data Center Sales Tax Exemption$0
    State of Wisconsin · granted 2023 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2022 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2021 · term yr · source
  • Texas Qualifying Large Data Center Project Exemption$0
    State of Texas · granted 2015 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2013 · term yr · source
  • Texas Qualifying Data Center Exemption$0
    State of Texas · granted 2013 · term yr · source

Water use

Modeled estimate~4.7M gpd
Direct (onsite cooling)
~2.8M gpd
Indirect (its electricity)
~1.9M gpd

No measured record exists, so this is a low-confidence model from 220 MW (disclosed IT power): 2.5 L/kWh cooling (arid climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Air quality near this site

source: AirNow
44
O3
Good
28
PM2.5
Good
18
PM10
Good

Air Quality Index from the nearest AirNow reporting area (Salt Lake City), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$128.4K
People of color
23%
Below poverty
4%
Tract population
2,837

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Columbia School in West Jordan, is 0.3 mi from this site (619 students). 6 public schools sit within a mile of the site.

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.