Mapped (unverified)
MEGA Gateway
China
Source: OpenStreetMap
MEGA Gateway is a mapped data center in China. DataCentersExposed has documented a 10,402 sq ft footprint at this site. It runs on China's grid, which was 58% fossil-fuelled at 526 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Footprint
10,402 sq ft
Grid carbon
526 gCO₂/kWh
Clean electricity
42%
Region
China
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
526 gCO₂/kWh
Clean electricity
42%
Fossil electricity
58%
National grid context, not this facility's own metering. Full country picture: China data centers.
In the news
source: Google News (local + English)- 新意网荣膺《联合国可持续发展目标香港成就奖2025》双项殊荣 #SUNeVisionMedia OutReach Newswire· Sep 12, 2025
- 新意网启动 MEGA IDC 第二期建设中华网· Mar 28, 2025
- 新意网启动第二届「初创飞航计划」 #SUNeVision #新意网Media OutReach Newswire· Dec 9, 2024
- 新意网联同翠谷工程及中华电力合作推出本地可再生能源方案 #SUNeVision #GreenValleyLandfill #CLPPowerMedia OutReach Newswire· Nov 12, 2024
- 新意网与香港宽频共同建设海底光缆 TKO Connect提升网络恢复能力 #SUNeVision #新意网Media OutReach Newswire· Sep 19, 2023
- 新意网(01686)2023财年:有息负债/净资产超200%新浪财经· Sep 11, 2023