Malmö Västergatan 4 / Stortorget

Malmö, Skåne län, Sweden

Source: Primary source

Malmö Västergatan 4 / Stortorget is a mapped data center in Skåne län, Sweden. It runs on Sweden's grid, which was 1% fossil-fuelled at 35 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 17, 2026

Real parent
Operator
Grid carbon
35 gCO₂/kWh
Clean electricity
99%
DC power price
7.47¢/kWh
Region
Skåne län
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Stena Fastigheter — colocation facility (27 networks present). Source: PeeringDB.

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
35 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
7.47¢/kWh

A large data center in Sweden pays 7.47¢/kWh for electricity — a household pays 23.51¢, 68% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: Sweden data centers.

See something wrong or missing on this page? Suggest a correction.