Logistix Data Center is a proposed data center in Butler County, OH, operated by Logistix Property Group. DataCentersExposed has documented 200 MW of reported power capacity and a 320 sq ft footprint at this site.

Reporting by · Updated Jun 18, 2026

Campaign · Decision pending

Take action

Butler, Ohio

0
supporters

Logistix Data Center in Hamilton, OH is contested. https://www.journal-news.com/news/residents-say-no-on-1b-data-center-project-wants-hamilton-to-do-the-same/L3YUSLLR2VHMDFXVBXKPBTOHCA/ Track what's being decided, when, and how to weigh in.

Your action kit

Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.

Power & your bill

200 MW of new demand — roughly a city of 160,000 homes.

Large new loads can raise transmission and capacity costs that land on every ratepayer. Residential power in OH is 18.8¢/kWh, up 16.6% year-over-year. (MW→homes is a rough ~800/MW planning figure.)

Source
Process

Demand a full, public review — not a rubber stamp.

Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.

Public comment (editable)

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Records / FOIA request

Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.

Join the campaign

Add your name and we'll email you before every hearing, with what to say and where to show up.

Helps show local strength to officials.

Double opt-in — confirm by email. We'll only email you about this campaign's hearings and milestones. Unsubscribe any time. We never share or sell your address. See our privacy policy.

Neighbors taking a stand

Be the first to say why this matters. Public notes appear here to show officials the strength of local feeling.
Real parent
Operator
Logistix Property Group
Power
200 MW
Footprint
320 sq ft
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Scheduled for 2026 Announced investment: $1.0B. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.

Operator chain

Grid & water — why here

source: HIFLD · EPA
Nearest substation
683 ft
Unknown113005 · 138 kV
Transmission line
244 ft
69 kV line
Municipal water
Served
Hamilton Public Water System

The closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Statewide cost of this incentive

Ohio reported $130.4M in Sales/use tax exemption for qualified property used in an eligible computer data center (R.C. § 122.175) for FY2024 (Ohio Department of Taxation / Office of Budget and Management). Program-wide, not attributable to this site.

source · All Ohio subsidies →

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

Nearest school

source: HIFLD / NCES

The nearest public school, Riverview Elementary School in Hamilton, is 0.4 mi from this site (650 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.