Skip to content
DataCentersExposed
Operating

Lincoln Rackhouse Maryland

12401 Prosperity Drive · Silver Spring, Montgomery County, MD

Source: OpenStreetMap

Lincoln Rackhouse Maryland is an operating data center in Montgomery County, MD. DataCentersExposed has documented a 146,301 sq ft footprint at this site.

Reporting by · Updated Jun 14, 2026

Real parent
Operator
Est. capacity
~25-60 MW
Footprint
146,301 sq ft
Utility
Potomac Electric Power Co
Grid
PJM
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Lincoln Rackhouse Maryland is an operating data center in Silver Spring, Montgomery County, Maryland, run by Lincoln Rackhouse. Its reported footprint is 146,301 square feet. The site draws power from Potomac Electric Power Co inside the PJM grid. Ownership above Lincoln Rackhouse is not disclosed in available records.

Tax breaks & subsidies

source: Good Jobs First / GASB 77

No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.

Water use

No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.

EPA permits & violations

source: EPA ECHO

No reported violations as of last sync.

What this site costs the grid

source: PJM RPM auction reports
BGE (Maryland) · 2027/28 auction
$333 /MW-day
Peaked at $127/MW-day in 2022/23 2.53× the rest of PJM

PJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's BGE pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →

This site's capacity-market cost (estimated)
$3M to $7.3M/yr

An estimated ~25 to 60 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.

Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →

Air quality near this site

source: AirNow
59
PM2.5
Moderate
37
O3
Good

Air Quality Index from the nearest AirNow reporting area (Suburban DC), as of 2026-06-10. Regional context — not this facility's own emissions.

Who lives nearby

source: Census ACS 2023
Median household income
$98.8K
People of color
67%
Below poverty
7%
Tract population
3,832

Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.

Nearest school

source: HIFLD / NCES

The nearest public school, Galway Elementary in Silver Spring, is 1.0 mi from this site (733 students).

Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).

Hearings timeline

No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.