Legacy Data Center
Marion, Guadelupe County, TX
Source: Primary source
Legacy Data Center is a proposed data center in Guadelupe County, TX. DataCentersExposed has documented 50 MW of reported power capacity and a 100,000 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkImported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Marion County resident, officials react to ‘Project Liberty’ data center withdrawalWBTW· Jun 18, 2026
- Data center company pulls Marion Co. project plansSpectrum News· Jun 15, 2026
- Developer pulls plug on $2.4B data center in rural SCPost and Courier· Jun 13, 2026
- Massive data center plan dropped in SC after latest public outcry against projectsThe State· Jun 12, 2026
- Stream Data Centers pulls out of controversial Marion County projectWMBF· Jun 11, 2026
- Project Liberty data center plan in Marion Co. no longer moving forwardWPDE· Jun 11, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Marion Middle in Marion, is 3.3 mi from this site (372 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.