Mapped (unverified)colocation
Lefdal Mine Data Center
Måløy, Vestland, Norway
Source: Primary source
Lefdal Mine Data Center is a mapped data center in Vestland, Norway. It runs on Norway's grid, which was 1% fossil-fuelled at 28 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
28 gCO₂/kWh
Clean electricity
99%
DC power price
6.47¢/kWh
Region
Vestland
Overview
source: linkLefdal Mine Datacenter AS — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
28 gCO₂/kWh
Clean electricity
99%
Fossil electricity
1%
Data-center power price
6.47¢/kWh
A large data center in Norway pays 6.47¢/kWh for electricity — a household pays 19.02¢, 66% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Norway data centers.
In the news
source: Google News (local + English)- Her kan det kome datasenterfjordabladet.no· Jun 9, 2026
- DSB fant ti avvik hos KI-datasenter i GlomfjordEnergiteknikk· Jun 1, 2026
- Kraftkrøll kan koste kommunene dyrt: – Skaper stor usikkerhetkulingen.no· May 13, 2026
- Motvind Norge om datasentre: – Dette er gjøkungen i hele kraftsystemet (+)Dagens Næringsliv· Apr 23, 2026
- Bråk om kraftinntekter: 79 datasenter forsterkar forskjellane mellom fattig og rik i Kommune-NoregNRK· Nov 18, 2025
- Langer ut mot «jojo-regulering»: – Det er uakseptabeltDigi.no· Nov 14, 2025
See something wrong or missing on this page? Suggest a correction.