Mapped (unverified)colocation
LCL Brussels South
Beersel, Vlaanderen, Belgium
Source: Primary source
LCL Brussels South is a mapped data center in Vlaanderen, Belgium, operated by LCL Belgium nv. It runs on Belgium's grid, which was 20% fossil-fuelled at 109 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
LCL Belgium nv
Operator
LCL Belgium nv
Grid carbon
109 gCO₂/kWh
Clean electricity
80%
DC power price
16.13¢/kWh
Region
Vlaanderen
Overview
source: linkLCL Belgium — colocation facility (1 networks present). Source: PeeringDB.
Operator chain
- Ultimate parentLCL Belgium nv
- Files asLCL Belgium nv
- This facilityLCL Brussels South
The grid behind this site
source: Ember · EurostatGrid carbon intensity
109 gCO₂/kWh
Clean electricity
80%
Fossil electricity
20%
Data-center power price
16.13¢/kWh
A large data center in Belgium pays 16.13¢/kWh for electricity — a household pays 33.13¢, 51% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Belgium data centers.
In the news
source: Google News (local + English)No recent coverage found for this facility.
See something wrong or missing on this page? Suggest a correction.