Mapped (unverified)colocation
KoloDC NL2
Meppel, Drenthe, Netherlands
Source: Primary source
KoloDC NL2 is a mapped data center in Drenthe, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Drenthe
Overview
source: linkKoloDC — colocation facility (52 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Nieuw hoogspanningsstation bij Meppel is voor 'ontwikkeling en verduurzaming van de samenleving'RTV Drenthe· Jan 31, 2026
- Gemeente Meppel opent eerste Drentse datacenter: "We zijn nu niet meer afhankelijk van de Amerikanen"Nieuwspaal· Jan 25, 2026
- Als Trump een mailbox in Nederland op slot zet, valt het kwartje: ‘Dit moet anders’de Stentor· Sep 20, 2025
- CapMan Infra neemt Serverius IT Infrastructure overITchannelPRO· May 12, 2023
- De meest gehate sites ter wereld, in de lucht via FlevolandNRC· Sep 16, 2022
- Storing bij gemeente Meppel, afspraken niet mogelijkRTV Drenthe· Dec 20, 2021