Mapped (unverified)colocation
Keppel Data Centres | Gore Hill Data Centre
Artarmon, New South Wales, Australia
Source: Primary source
Keppel Data Centres | Gore Hill Data Centre is a mapped data center in New South Wales, Australia. It runs on Australia's grid, which was 61% fossil-fuelled at 525 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
525 gCO₂/kWh
Clean electricity
39%
Region
New South Wales
Overview
source: linkKeppel Data Centres Holding Pte Ltd — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
525 gCO₂/kWh
Clean electricity
39%
Fossil electricity
61%
National grid context, not this facility's own metering. Full country picture: Australia data centers.
In the news
source: Google News (local + English)- The $155 billion powerhouse hiding in plain sight and saving the economyNine.com.au· Jun 6, 2026
- Goodman gears up for energy challenge in data centresAFR· May 26, 2026
- NSROC calls for tighter state control over data centre rolloutNorth Sydney Sun· Apr 13, 2026
- Multiplex starts construction on NEXTDC's S4 SydneyIT Brief Australia· Mar 31, 2026
- The Sydney suburbs that will house $52b of power-hungry data centresAFR· Mar 27, 2026
- Your every swipe, tap and click goes through one of these buildings. They are also driving the NSW economySMH.com.au· Mar 26, 2026
See something wrong or missing on this page? Suggest a correction.